Coastal Grand Mall in Myrtle Beach, South Carolina

Coastal Grand Mall is the largest mall on the South Carolina coast, the premier retail center for Myrtle Beach and the Grand Strand. Stores here turn over steadily, and when a brand signs a lease the landlord calendar starts immediately: rent commences and the space is expected open by a fixed date. Plescia Construction & Development performs fast-track retail interior fit-outs at Coastal Grand Mall — overlapping design, procurement, permitting, and construction so a raw or existing space becomes an open, revenue-generating store as quickly as the mall’s schedule demands, without cutting corners on quality or code. The result our tenants care about is simple: a store that opens on the promised date and passes inspection the first time.

A brief history of Coastal Grand Mall

Coastal Grand Mall opened in 2004, built by CBL & Associates Properties with the local Burroughs & Chapin company. Designed with a coastal, boardwalk-themed food court and an outdoor entertainment pavilion, it quickly became the dominant retail center of the Grand Strand, drawing shoppers away from the older Myrtle Square Mall, which subsequently closed.

Construction and development

Coastal Grand is owned and managed by CBL Properties and spans roughly 1.05 million square feet with more than 170 stores, anchored by Belk, Dillard’s, JCPenney, Dick’s Sporting Goods, and Old Navy — the second-largest mall in South Carolina. It sits off U.S. Route 17 near Harrelson Boulevard in Myrtle Beach, Horry County. As a coastal property in a hurricane-exposed market, it is built to high wind standards, so verifying how a given storefront ties into the base building — and how exterior work meets the coastal code — is the first step in any fast-track fit-out here.

The intricacies of retail construction inside an occupied mall

Building a store inside a live mall is very different from ground-up work. The center stays open and full of shoppers throughout construction, so a fit-out at Coastal Grand Mall is governed as much by logistics and coordination as by the drawings. Plescia plans each project around the realities of an occupied, revenue-producing building:

  • After-hours and night work for noisy, dusty, or common-area-impacting activity, phased so neighboring stores never have to close.
  • Landlord “tenant criteria” standards — storefront lines, sign bands, closure barricades, and utility tie-in points follow the mall’s design-criteria manual, not just the tenant’s drawings.
  • Temporary barricades and hoarding built to the mall’s graphic and safety standards, protecting shoppers and screening the work.
  • Service-corridor and loading-dock logistics — deliveries, dumpsters, and material handling scheduled through shared docks and freight elevators in tight windows.
  • Base-building tie-ins — sprinkler, fire alarm, HVAC, and electrical connections coordinated with the mall’s systems, often under supervised shutdowns.
  • Hot-work permits and fire watch, dust and odor control, protection of common-area finishes, and constant housekeeping right up to the barricade line.

Sequencing all of this — not the raw construction — is usually what determines whether a store opens on time. Long-lead items like storefront glass, millwork, and specialty equipment are identified and ordered on day one, and the schedule is built backward from the landlord’s required open date.

Interfacing with the City of Myrtle Beach

Coastal Grand Mall sits in Myrtle Beach, Horry County, so permits and inspections run through the city under the South Carolina Building Code, including its coastal high-wind provisions. Myrtle Beach’s dramatic seasonal swing — a summer tourist surge and a quieter off-season — is a real scheduling factor, and the U.S. 17 corridor shapes delivery timing and crew access. Like most malls the property enforces a construction and delivery freeze through the peak holiday selling season. A realistic schedule here is built around the city’s process, the coast, and the retail calendar.

Working with local building officials

All construction here is regulated under the South Carolina Building Code, with permits and inspections handled through the City of Myrtle Beach building department and its sub-code officials for building, electrical, plumbing, and fire. As a coastal South Carolina building it is engineered for high winds, and exterior work is governed by the code’s coastal wind-design provisions, which we account for in the permit set. A retail build-out typically also involves separate sign permits, fire-subcode review of any sprinkler and alarm changes, and — for any restaurant or food tenant — health-department review of the food-service scope. A fast-track fit-out depends on keeping that whole process moving in parallel with the work: a clean, code-compliant permit set, quick resolution of plan-review comments, any required special inspections, rough and final inspections sequenced to the build, and a temporary certificate of occupancy so the store can open on the landlord’s date while final punch items close out. Plescia manages that permitting and inspection track directly and maintains the working relationships with local officials that keep it from becoming the bottleneck.

Coordinating with Coastal Grand Mall mall management

Every project at Coastal Grand Mall runs through CBL Properties’ tenant-coordination process, which sits alongside the municipal permitting track and is just as important to hitting a date. Before a tool is on site, that means landlord-approved drawings, certificates of insurance meeting the mall’s required limits, a signed contractor rules-of-conduct agreement, and badging for every worker. During construction it means honoring approved work hours, staging and hoisting only where permitted, using designated docks and freight routes, protecting common-area finishes, removing waste on the mall’s terms, and coordinating any utility interruption with mall operations and security in advance. At closeout the landlord expects a clean turnover — inspections passed, barricade removed on schedule, and the space delivered show-ready. Plescia’s job is to make that coordination invisible to the tenant, carrying the landlord’s and the municipality’s requirements so the brand can focus on merchandising and opening.

How Plescia keeps a fit-out on the fast track

Speed on a mall build-out comes from process, not shortcuts. We begin procurement of long-lead items — storefront systems, custom millwork, specialty lighting and equipment — on day one, because those deliveries, not the labor, usually set the critical path. We run the permit application in parallel with the closeout of design instead of waiting for a fully finished set, and we build a milestone schedule backward from the landlord’s required open date so every trade, inspection, and delivery has a fixed slot. Night and weekend crews compress the work that has to happen while the mall is dark, and a single Plescia point of contact coordinates the tenant’s design team, the local building department, and mall management at the same time, so nothing sits waiting on a hand-off. Just as important, we surface problems early — a long-lead conflict, a code question, a landlord condition — while there is still time to solve them, rather than discovering them at final inspection.

Fast-track retail fit-outs at Coastal Grand Mall are one part of Plescia Construction & Development’s broader commercial general contracting practice, which spans multiple states and markets from our regional offices. On every one, the goal is the same and it is measurable: a finished, code-compliant, inspection-ready store, turned over clean and open on the date the lease demands. If you are planning a build-out at Coastal Grand Mall, we can help you hit that date.

Frequently Asked Questions

Can Plescia build out a store while Coastal Grand Mall stays open?

Yes. We phase retail fit-outs at Coastal Grand Mall around the mall’s operating hours, performing noisy, dusty, or common-area work after hours and behind approved barricades so neighboring stores and shoppers are never disrupted.

Who handles permitting for a store build-out at Coastal Grand Mall?

Plescia manages the entire permitting and inspection process under the South Carolina Building Code through the City of Myrtle Beach building department and its building, electrical, plumbing, and fire sub-code officials, including any sign, fire-subcode, or health-department reviews, and drives toward the temporary certificate of occupancy needed to open.

What is a fast-track retail fit-out?

A fast-track fit-out overlaps design, procurement, permitting, and construction instead of running them in sequence, and orders long-lead items immediately, so a leased space becomes an open, inspection-ready store in the shortest possible time — the approach a mall like Coastal Grand Mall requires to hit landlord open dates.

How does Plescia coordinate with Coastal Grand Mall mall management?

We work through CBL Properties’ tenant-coordination process — landlord-approved drawings, certificates of insurance, contractor rules of conduct, worker badging, designated docks and freight routes, and scheduled utility shutdowns — so the landlord’s requirements are met without slowing the tenant’s opening.

How long does a fast-track retail fit-out at Coastal Grand Mall take?

It depends on the size and complexity of the space, but the point of fast-tracking is to compress the timeline as much as the work safely allows — overlapping design, procurement, and permitting, ordering long-lead items immediately, and using night and weekend crews — so a tenant at Coastal Grand Mall opens on the landlord’s required date rather than weeks later, and passes inspection the first time.

Does the coastal location affect a fit-out at Coastal Grand Mall?

Yes. Coastal Grand is in a hurricane-exposed coastal market, so the building meets high wind standards and exterior work follows the South Carolina code’s coastal wind-design provisions. We build those requirements into the permit set and schedule.

Who owns and manages Coastal Grand Mall?

Coastal Grand Mall is owned and managed by CBL Properties. We coordinate each fit-out through CBL’s tenant-coordination process.


learn more

Privacy Preference Center