
WestGate Mall is the primary enclosed mall for Spartanburg and the western Upstate of South Carolina. Stores here turn over steadily, and when a brand signs a lease the landlord calendar starts immediately: rent commences and the space is expected open by a fixed date. Plescia Construction & Development performs fast-track retail interior fit-outs at WestGate Mall — overlapping design, procurement, permitting, and construction so a raw or existing space becomes an open, revenue-generating store as quickly as the mall’s schedule demands, without cutting corners on quality or code. The result our tenants care about is simple: a store that opens on the promised date and passes inspection the first time.
A brief history of WestGate Mall
WestGate Mall opened on October 28, 1975, developed by Arlen Realty and Development Corporation, and was the largest mall in South Carolina at the time. A 1995 renovation and expansion by CBL and The Rouse Company made it the first mall in the Carolinas to feature six anchors.
Construction and development
WestGate Mall totals roughly 954,000 square feet, primarily on one level, with about 110 stores, anchored by Belk, Dillard’s, JCPenney, and Rural King, with a Costco on mall property. After passing through several owners — JMB Realty, Bramalea, and CBL — it was acquired by Namdar Realty Group in 2024. It sits off Interstate 26 and U.S. Highway 29 on West Blackstock Road in Spartanburg. Because it has grown and turned over its anchors across five decades, conditions vary across it, so verifying how a given storefront ties into the base building is the first step in any fast-track fit-out here.
The intricacies of retail construction inside an occupied mall
Building a store inside a live mall is very different from ground-up work. The center stays open and full of shoppers throughout construction, so a fit-out at WestGate Mall is governed as much by logistics and coordination as by the drawings. Plescia plans each project around the realities of an occupied, revenue-producing building:
- After-hours and night work for noisy, dusty, or common-area-impacting activity, phased so neighboring stores never have to close.
- Landlord “tenant criteria” standards — storefront lines, sign bands, closure barricades, and utility tie-in points follow the mall’s design-criteria manual, not just the tenant’s drawings.
- Temporary barricades and hoarding built to the mall’s graphic and safety standards, protecting shoppers and screening the work.
- Service-corridor and loading-dock logistics — deliveries, dumpsters, and material handling scheduled through shared docks and freight elevators in tight windows.
- Base-building tie-ins — sprinkler, fire alarm, HVAC, and electrical connections coordinated with the mall’s systems, often under supervised shutdowns.
- Hot-work permits and fire watch, dust and odor control, protection of common-area finishes, and constant housekeeping right up to the barricade line.
Sequencing all of this — not the raw construction — is usually what determines whether a store opens on time. Long-lead items like storefront glass, millwork, and specialty equipment are identified and ordered on day one, and the schedule is built backward from the landlord’s required open date.
Interfacing with the City of Spartanburg
WestGate Mall sits in Spartanburg, so permits and inspections run through the local building office under the South Carolina Building Code. Its position off Interstate 26 in the growing Upstate shapes delivery timing and crew access, and its mix of active retail and recently repositioned anchor space means fit-outs range from standard stores to larger conversions. Like most malls the property enforces a construction and delivery freeze through the peak holiday selling season. A realistic schedule here is built around the local process, the traffic, and the retail calendar.
Working with local building officials
All construction here is regulated under the South Carolina Building Code, with permits and inspections handled through the City of Spartanburg building office and its sub-code officials for building, electrical, plumbing, and fire. A retail build-out typically also involves separate sign permits, fire-subcode review of any sprinkler and alarm changes, and — for any restaurant or food tenant — health-department review of the food-service scope. A fast-track fit-out depends on keeping that whole process moving in parallel with the work: a clean, code-compliant permit set, quick resolution of plan-review comments, any required special inspections, rough and final inspections sequenced to the build, and a temporary certificate of occupancy so the store can open on the landlord’s date while final punch items close out. Plescia manages that permitting and inspection track directly and maintains the working relationships with local officials that keep it from becoming the bottleneck.
Coordinating with WestGate Mall mall management
Every project at WestGate Mall runs through the tenant-coordination process run by Namdar Realty Group, which sits alongside the municipal permitting track and is just as important to hitting a date. Before a tool is on site, that means landlord-approved drawings, certificates of insurance meeting the mall’s required limits, a signed contractor rules-of-conduct agreement, and badging for every worker. During construction it means honoring approved work hours, staging and hoisting only where permitted, using designated docks and freight routes, protecting common-area finishes, removing waste on the mall’s terms, and coordinating any utility interruption with mall operations and security in advance. At closeout the landlord expects a clean turnover — inspections passed, barricade removed on schedule, and the space delivered show-ready. Plescia’s job is to make that coordination invisible to the tenant, carrying the landlord’s and the municipality’s requirements so the brand can focus on merchandising and opening.
How Plescia keeps a fit-out on the fast track
Speed on a mall build-out comes from process, not shortcuts. We begin procurement of long-lead items — storefront systems, custom millwork, specialty lighting and equipment — on day one, because those deliveries, not the labor, usually set the critical path. We run the permit application in parallel with the closeout of design instead of waiting for a fully finished set, and we build a milestone schedule backward from the landlord’s required open date so every trade, inspection, and delivery has a fixed slot. Night and weekend crews compress the work that has to happen while the mall is dark, and a single Plescia point of contact coordinates the tenant’s design team, the local building department, and mall management at the same time, so nothing sits waiting on a hand-off. Just as important, we surface problems early — a long-lead conflict, a code question, a landlord condition — while there is still time to solve them, rather than discovering them at final inspection.
Fast-track retail fit-outs at WestGate Mall are one part of Plescia Construction & Development’s broader commercial general contracting practice, which spans multiple states and markets from our regional offices. On every one, the goal is the same and it is measurable: a finished, code-compliant, inspection-ready store, turned over clean and open on the date the lease demands. If you are planning a build-out at WestGate Mall, we can help you hit that date.
Frequently Asked Questions
Can Plescia build out a store while WestGate Mall stays open?
Yes. We phase retail fit-outs at WestGate Mall around the mall’s operating hours, performing noisy, dusty, or common-area work after hours and behind approved barricades so neighboring stores and shoppers are never disrupted.
Who handles permitting for a store build-out at WestGate Mall?
Plescia manages the entire permitting and inspection process under the South Carolina Building Code through the City of Spartanburg building office and its building, electrical, plumbing, and fire sub-code officials, including any sign, fire-subcode, or health-department reviews, and drives toward the temporary certificate of occupancy needed to open.
What is a fast-track retail fit-out?
A fast-track fit-out overlaps design, procurement, permitting, and construction instead of running them in sequence, and orders long-lead items immediately, so a leased space becomes an open, inspection-ready store in the shortest possible time — the approach a mall like WestGate Mall requires to hit landlord open dates.
How does Plescia coordinate with WestGate Mall mall management?
We work through the tenant-coordination process run by Namdar Realty Group — landlord-approved drawings, certificates of insurance, contractor rules of conduct, worker badging, designated docks and freight routes, and scheduled utility shutdowns — so the landlord’s requirements are met without slowing the tenant’s opening.
How long does a fast-track retail fit-out at WestGate Mall take?
It depends on the size and complexity of the space, but the point of fast-tracking is to compress the timeline as much as the work safely allows — overlapping design, procurement, and permitting, ordering long-lead items immediately, and using night and weekend crews — so a tenant at WestGate Mall opens on the landlord’s required date rather than weeks later, and passes inspection the first time.
Does Plescia handle anchor conversions at WestGate Mall?
Yes. WestGate has repositioned anchor space in recent years, and converting former department-store boxes for new tenants is exactly the kind of work we fast-track, alongside standard in-line fit-outs.
Who owns and manages WestGate Mall?
WestGate Mall was acquired by Namdar Realty Group in 2024. We coordinate each fit-out through the mall’s tenant-coordination process.
Where is WestGate Mall located?
WestGate Mall is off Interstate 26 and U.S. Highway 29 on West Blackstock Road in Spartanburg, serving the western Upstate of South Carolina. Permits run through the local building office, and we manage that process.

